Left Engine Maintenance Highlights - Recent

Date Hobbs Time in Service

Work Performed

11/17/2000 1738.8 1.2 Removed and overhauled inboard turbo-charger (by Approved Turbo Components, Inc.) and installed with new gaskets. (Aero-Specialties, Van Nuys CA)
3/11/98 1617.6 122.4 All engine hoses replaced. New lord mounts installed. Replaced exhaust and cross eliminations (Knisley). Replaced both magnetos. (Krueger Aviation, Marysville CA)
9/28/93 1361.0 379.0 Turbo overhauled by Kelpak Industries and installed on inboard side.
3/19/93 1299.8 440.2 Annual Inspection: (Henry Weber Aircraft Distributors)
3/4/93 1299.8 440.2 Replaced engine driven fuel pump.
3/2/92 1231.7 508.3 Annual Inspection: (Henry Weber Aircraft Distributors)